Photo Gallery


2009 PRI Shop Expansion

PRI Employees at the Grand Opening Celebration
PRI Facility with Addition Being Added on Rear
Additional 13,000 sqft of Floor Space is Available Completed Addition with Pad for Sandblast and Outdoor Assembly

Thermobatch
Decontamination

An EDS Cook Tank with Filters, Macerators and Effluent Cooling Systems EDS Cook Tank
Three Tank EDS System with Central Control Panel EDS Cook Tanks Mounted on Load Cells
EDS System With One Collection and One Cook Tank EDS System with One Collection and Two Cook Tanks
Davit Arms on Over-Sized Manways to Allow Easy Access to Interior Controls on Top of a Cook Tank
Interior of a Cook Tank Demonstration of a Mixer in a Cook Tank of an EDS System
EDS Systems (3) In Preparation for Shipment to China. Vessels are SELO Approved. Three EDS Systems, Each with a collection Tank and Two Cook Tanks. Vessels are SELO Approved.
Two Cook Tank EDS System Single Tank Cook Tank With External Heat Exchanger
EDS Systems Awaiting Shipment on PRI's Production Floor

Auto Flow
Decontamination

Auto Flow Systems Come Completely Assembled and in Attractive Cabinets Control Panels are User Friendly and Completely Automated
Units Available In Different Throughput Rates

Decontamination Control and
Building Human Interface

High Voltage Section of a Control Panel. All Panels are Built in PRI's UL Listed Shop PRI Control Circuitry
Installed System Being Started In The Field By a PRI Technician
Terminal Strips Neatly Laid Out and All Connections Labeled Floor Mounted Control Panel
An Early EDS System Installed

Sterile Vents
HEPA Filters

 
 

After Cooler and other
Ancillary Equipment

 
 

Caustic Digester
Tissue Digesters

Lifting Bar Lowered Into A Basket CDU Partially Assembled. Note "Dimpled" Steamjacket
Platform for Access to CDU Vessel. Note Yellow Saftey Gate and Operator Controls Mounted on Platform Completed Digestor Awaits Shipment
Digestor Control Panel and PRI Engineer Two 500 Pound Digestors Ready to Ship
Upper Section of a 5000 Pound Digestor. Protective Barrier can be Moved for Loading.
Typical Process Monitoring Screen Showing Opened and Closed Valves Process Flow CDU Under Construction
Side-View of an 80 pound Digestor 80 Pound Digestor Unit. Electric Basket Hoist
80 Pound Digestor Showing Operator Interface Screen Caustic Digester Vessel Under Construction
Caustic Digester Vessel Under Construction

Progressive Recovery supplies systems to meet the requirements of Canada, North America, South America, Asia, Europe, China, India, Africa, and Australia.